Ø350mm Explosion Isolation Valves with Pneumatic slide dampers in front to allow the customer to control which lines they require open at any given time

Super Blower SBF282-5 Extraction System Staircraft

Super Blower SBF282-5 Extraction System Installation of the Super Blower SBF282-5 Extraction System at Staircraft’s Ansty Manufacturing Facility Project Overview Case Study: Installation of the Super Blower SBF282-5 Extraction System at Staircraft’s Ansty Manufacturing Facility Project Overview At its new state-of-the-art manufacturing facility in Ansty near Coventry, Staircraft required a high-capacity, energy-efficient extraction solution to […]

Wood Recycling – HG Ductwork installation

Wood Recycling – HG Ductwork installation Project Details Indusvent recently completed a ductwork installation using Ø700 HG Mild Steel powder coated ductwork at a Wood recycling facility Due to the high volume of material throughput approximately 6 to 12 tons per hour depending upon loading and the extremely abrasive nature of the material being conveyed, […]

Bespoke Bathroom and Joinery Company

Bespoke Bathroom and Joinery Company Project Details For over 30 years, Vanity Hall Limited have been manufacturing exemplary bathroom furniture in the heart of England.  They have recently taken the bold decision to expand their existing facilities to now cover over 60,000sq.ft of office suite and manufacturing area. In view of this, they have invested […]

BF55 -4 Blower filter, with a Ø300mm transport line to a single line trailer with automatic pressure sensing when trailer is full
BF55 -4 Blower filter, with a Ø300mm transport line to a single line trailer with automatic pressure sensing when trailer is full